Dr. John Bradfield's iconic balanced cantilever truss. Demonstrates massive negative bending moments over river piers, top-chord tension, bottom-chord pier thrust, and a simply-supported suspended center span.
A.E. Harding Frew's heritage-listed three-span "Rainbow Arch". Highlights the fundamental structural contrast of arches: monumental parabolic ribs in pure compression thrusting into bedrock, and vertical hangers in pure tension suspending the road deck.
Grimshaw & WSP's dramatic active transport bridge. Features a sleek 75-metre steel mast leaning forward 22° over the Brisbane River, balanced by South Bank backstay tie-downs while an elegant fan of stay cables suspends the slender aerodynamic deck.
Cox Architecture & Arup's monumental active transport bridge. Features an extraordinary 83-metre needle mast (taller than Story Bridge!) holding a 215m navigable river span, an over-water cafe pavilion, and deep cliff tie-down anchors resisting uplift.
Australia's first bridge built exclusively for public transit buses, cyclists, and pedestrians (no private cars). Two 50-metre inverted-Y wishbone towers suspend a 185m central span carrying heavy 16t and 24t articulated Brisbane City Council transit buses.
The world's largest tensegrity bridge, designed by Cox Rayner and Arup. Embodies Buckminster Fuller's principle of "islands of compression inside an ocean of tension": floating tubular steel struts enter pure compression, held aloft entirely by an intricate cable web.
| Bridge Name | Year | Typology | Primary Upper Member | Deck Suspension | Foundation Action | Traffic Type |
|---|---|---|---|---|---|---|
| Story Bridge | 1940 | Balanced Cantilever Truss | Tension (Over Piers) | Bottom chord truss bearing | Pier compression + Landward uplift tie-down | Heavy Freight (B-Doubles, Buses, Cars) |
| William Jolly Bridge | 1932 | Three-Span Through-Arch | Compression (Arch Ribs) | Tension (Vertical Hangers) | Massive diagonal pier thrust into riverbed | General Traffic (Cars, Buses, Trucks) |
| Neville Bonner Bridge | 2024 | Asymmetric Cable-Stayed | Compression (75m Leaning Mast) | Tension (Radiating Forestays) | Dolphin footing thrust + South Bank tie-down | Active (Walkers, Joggers, Bikes, Scooters) |
| Kangaroo Point Bridge | 2024–25 | Single-Mast Cable-Stayed | Compression (83m Needle Mast) | Tension (215m Stayed Span) | Deep river caisson + Cliff uplift tie-down | Active Commuters & Promenade |
| Eleanor Schonell Bridge | 2006 | Twin-Pylon Cable-Stayed | Compression (Twin 50m Towers) | Tension (Semi-Harp Cables) | Twin river pier caisson compression | Bus Rapid Transit (16t & 24t) + Active |
| Kurilpa Bridge | 2009 | Tensegrity Bridge | Compression (Floating Struts) | Tension (Continuous Cable Net) | Two river piers + landward abutments | Cultural Precinct Active Transport |